- Connect to the island using SoMove
- Configure the communication card
- For the first DOL enable the Load Energy Monitoring and also assign the SIL Group
- For a Double-Direction motor configure accordingly, it will automatically assign two DOL to the avatar
- Parameters to update:
> Power Supply: 3 Phase
> Upstream Voltage: 380 V
> Rating: kW
> Product reference
- Settings:
> Enable all Electrical protection. Phase reversal may have to be updated depending on the motor direction.
> For Load Protection, enable Jam, Stall, Undercurrent and Overcurrent.
No comments:
Post a Comment